1 2 3 4 5 6 7 8 9 10 11 12 13
  NEWS & HEADLINES
Institute Code : 4118
 
 
http://www.hitwebcounter.com/
Lab Details
 
ELECTRICAL ENGINEERING LAB

 
 
1- Total Expenditure :-
Rs 3,63,518 /-
2- Lab In-charge :- Ms. S. R. Bhawarkar
3- Supporting Staff :- Mr. A.V. Joshi, Mr. S. N. Deshmukh
4- Lab Technician :- Mr. J. J. Kashikar
5. Laboratory Shared by :-
 
Odd Semester
 
BRANCH SUBJECT
B. E. IST Semester Basic Electrical Engineering
Electrical(E&P)Engineering IVTH Semester Network Analysis
 
7- Lab Area :- 96 sq. m.

8- Lab Engagement Per Week :- 36 Hrs

9- Utilisation Factor :- 75.05%
 
MACHINE LABORATORY
 
 
1- Total Expenditure :- Rs 8,52,778/-

2- Lab In-charge :- Ms. J. B. Fulzele

3- Supporting Staff :- Ms. Y. A. Sadawarte Mr. G. P. Bhanginwar

4- Lab Techncian :- Mr. S. R. Darne

5- Major Equipments :-
 
1- AC Induction Motor (1 ph/3 ph)
2- Dc Gen AC Motor Set 

3- DC Generator Motor Set

4- DC Motor – 3 Ph Alternator Set
5- AC Induction Motor (1 ph/3 ph)
 
6- Laboratory Shared by :-

Even Semester :-
 

BRANCH

SUBJECT

Computer Engineering  IVTH  Semester

Basic Electrical Machine

Electronics Engineering  IVTH  Semester

Basic Electrical Machine

Electronics & Telecommunication Engineering  IVTH  Semester

Basic Electrical Machine

Electrical Engineering IVTH Semester Electrical Machine -1
 
Lab Engagement Per Week :- 18 Hrs (Odd Sem)
Utilisation Factor :- 63.15% (Odd Sem)
 
Odd Semester:-
 
BRANCH SUBJECT
Electrical Engineering VTH Semester Electrical Machine -2
 
7- Lab Area :- 210 sq. m.

8- Lab Engagement Per Week :- 4 Hrs (Odd Sem)

9- Utilisation Factor :- 11.76% (Odd Sem)
 
POWER CIRCUIT LAB
 
 
1- Total Expenditure :- Rs 9,21,143 /-

2- Lab In-charge :- Mr. S. D. Zilpe

3- Supporting Staff :- Ms. R. T. Hiware, Mr. P. K. Srivastava

4- Lab Technician :- Mr. P. S. Pachare

6- Laboratory Shared by :-

Odd Semester :-
 

BRANCH

SUBJECT

Electronics Engineering  VTH  Semester

Power Electronics

Electronics & Telecommunication  Engineering  VTH  Semester

Power Electronics

Electrical Engineering  VIITH  Semester

Power Electronics

 


7- Lab Area :- 96 sq. m.

8- Lab Engagement Per Week :- 16Hrs

9- Utilisation Factor :- 41.02%
 
SWITCH GEAR & PROTECTION LAB
 
 
1- Total Expenditure :- Rs 3,41,279 /-

2- Lab In-charge :- Mr. D. K. Bhingare

3- Lab Attendant :- Mr. D. G. Thakre

4- Major Equipments :- Relays Set Up

5- Lab Area :- 40.25 sq. m.

6- Lab Engagement Per Week :- 4 Hrs

7- Utilisation Factor :- 9.09%
 
                       
  Location map Last updated on 20th July 2016     Copy Right 2016-17 B. D. C.E., Sevagram, Wardha.  Powered by
  Rules & Regulations Webmaster     Best View In Firefox, Google Crome, IE 9